All projects
Transport & Logistics · Dammam, Saudi Arabia
Cold-Chain Logistics Hub
A 28,000-pallet cold store with automated racking, warehouse systems and a secured perimeter.
- Year
- 2024
- Duration
- 19 months
- Status
- Completed
- Our role
- Design & build management
28,000pallet positions
-25 °Cto +4 °C zones
3 → 1sites consolidated
The challenge
The client was consolidating three older warehouses into one temperature-controlled hub and needed operations, IT and security ready on day one.
Our approach
SEYA Projects managed the design-and-build contract. SEYA Tech integrated the warehouse management and temperature monitoring systems; SEYA Security & Intelligence designed the perimeter, CCTV and access control.
Scope of work
- Design & build management
- Refrigeration coordination
- WMS integration
- Temperature monitoring
- Security systems
Timeline
- DesignQ1 2023
- ConstructionQ2 2023 – Q2 2024
- Systems & go-liveQ3 2024